Operating Budget 2025-2026
WATER AND SEWER FUND ( continued)
FY 2025-2026 OBJECTIVES Engineering & GIS • Complete design and implement Areas 6 and 7 of the unidirectional flushing program to improve water quality by systematically scouring water pipes. • Develop a water service line replacement schedule based on results of the Lead and Copper Improvements Program to meet EPA and VDH requirements. • Construct a fence around the Highland Park water tanks to prevent unauthorized access as outlined in the Risk and Resilience Assessment. • Complete a Communication Infrastructure audit for the North Main water tank. • Complete the construction of the Windsor Hill Force Main replacement project. • Bid and award CIP projects to relocate sewers under structures. • Complete construction of the Lucas Drive Sewer and Hospital Pump Station projects. • Complete the construction of upgrades to the Cedar Run Pump Station. Public Works • Continue fire hydrant replacement schedule. • Continue inspection of 240 STEP/STEG tanks around town. • Continue locating and identifying assets in the water and sewer system to improve maintenance and emergency response. • Replace the additional 1,200 feet of sewer force main at Windsor Hills Pump Station. • Replace approximately 850 feet of water main along Locust Avenue and Eckel Street • Upgrade Westover sanitary sewer pump station mechanical system. • Replace Highland Park water pump station pumps. • Install 1400 feet of water main along Eheart Street. • Abandon aging or outdated water infrastructure located in the Alleghany neighborhood.
2022/2023 Actual
2023/2024 Actual
2024/2025 Adopted
2024/2025 Projected
2025/2026 Proposed
WATER AND SEWER FUND Engineering & GIS: Professional Service Contracts Awarded and Administered Construction Contracts Awarded and Managed Safe Drinking Water Act Compliance Water Quality Complaints (Odor, Taste, Color, or Appearance)
$686,950
$634,250
$225,250
$756,210
$289,010
$1,253,229 $8,296,051 $3,024,341 $3,111,650
$2,610,000
100%
100%
100%
100%
100%
0
9
10
7
9
Number of Sanitary Sewer Overflows
4
0
0
4
3
New Water Mains (LF)
9,056
2,928
7,262
4,177
8,388
Water Main Replacements / Abandonment (LF)
New metric New metric New metric
2,000
850
New Sewer Mains (LF)
11,176
4,643
9,122
2,326
6,667
Sanitary Sewer Replacements / Renewal (LF) Public Works: Ratio of Department Water & Sewer Operational Expenses to Fund Revenues
New metric New metric New metric
31,060
101,200
22%
21%
24%
26%
25%
153
Made with FlippingBook Digital Publishing Software