Town of Blacksburg

PROJECT DETAILS/COST ESTIMATES

Sustainability

Department

St. Luke and Odd Fellows Hall Restoration

Project Title

Status

Existing

Project Description

The St. Luke and Odd Fellows Hall Working Group has identified a series of improvements to enhance the condition, usability, and long-term durability of this historic Town-owned building, operated by the Blacksburg Museum and Cultural Foundation (BMCF). Recommended actions include new interior finishes for walls and ceilings, light flooring refurbishment, repair of windows and doors in alignment with historic standards, a new chimney cap, lighting upgrades, EMS networked fire and security systems, structural reinforcement of the stage area, reconstruction of sub-stage storage, energy efficiency upgrades, interior storm windows with museum-grade UV protection, replacement of the HVAC system, a new humidity control system, and new landscape plantings. Construction will be coordinated among Public Works, the Office of Sustainability, and BMCF staff. This request expands upon the previously approved CIP budget to address additional needs identified after the initial submission, including: • Findings from the Historic Paint Analysis requiring historically accurate restoration of interior paints, wood finishes, and plaster stabilization. • Additional structural engineering and construction planning to reinforce the stage and sub-floor. • Expanded HVAC system design work.

Goal Addressed

Estimated Start Date

Estimated End Date

Winter 2025

Summer 2027

Total Five-Year CIP

Funded through 6/30/2026

Funding Sources General Fund

Total Project Funding

FY2027 FY2028 FY2029 FY2030 FY2031

$77,221 Continuing

$77,221

$77,221

General Obligation Bonds Water & Sewer Fund Stormwater Fund Solid Waste Fund VDOT Revenue Sharing

$0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0

VDOT Smart Scale

Other/Grants Total Sources

$77,221

$0 $77,221

$0

$0

$0

$0 $77,221

Total Five-Year CIP

Appropriated through 6/30/2026 FY2027 FY2028 FY2029 FY2030 FY2031

Expenditure Type Design/Engineering

Total Project Cost

$0

$0

Construction

$264,621

187,400 77,221

$77,221

Land Acquisition

$0 $0

$0 $0

Vehicles/Equipment

Total Uses

$264,621

$187,400 $77,221

$0

$0

$0

$0 $77,221

Operating Impact

Town of Blacksburg

32

FY 2027-2031 Adopted

Made with FlippingBook Digital Proposal Maker