Town of Blacksburg
PROJECT DETAILS/COST ESTIMATES
Sustainability
Department
St. Luke and Odd Fellows Hall Restoration
Project Title
Status
Existing
Project Description
The St. Luke and Odd Fellows Hall Working Group has identified a series of improvements to enhance the condition, usability, and long-term durability of this historic Town-owned building, operated by the Blacksburg Museum and Cultural Foundation (BMCF). Recommended actions include new interior finishes for walls and ceilings, light flooring refurbishment, repair of windows and doors in alignment with historic standards, a new chimney cap, lighting upgrades, EMS networked fire and security systems, structural reinforcement of the stage area, reconstruction of sub-stage storage, energy efficiency upgrades, interior storm windows with museum-grade UV protection, replacement of the HVAC system, a new humidity control system, and new landscape plantings. Construction will be coordinated among Public Works, the Office of Sustainability, and BMCF staff. This request expands upon the previously approved CIP budget to address additional needs identified after the initial submission, including: • Findings from the Historic Paint Analysis requiring historically accurate restoration of interior paints, wood finishes, and plaster stabilization. • Additional structural engineering and construction planning to reinforce the stage and sub-floor. • Expanded HVAC system design work.
Goal Addressed
Estimated Start Date
Estimated End Date
Winter 2025
Summer 2027
Total Five-Year CIP
Funded through 6/30/2026
Funding Sources General Fund
Total Project Funding
FY2027 FY2028 FY2029 FY2030 FY2031
$77,221 Continuing
$77,221
$77,221
General Obligation Bonds Water & Sewer Fund Stormwater Fund Solid Waste Fund VDOT Revenue Sharing
$0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0
VDOT Smart Scale
Other/Grants Total Sources
$77,221
$0 $77,221
$0
$0
$0
$0 $77,221
Total Five-Year CIP
Appropriated through 6/30/2026 FY2027 FY2028 FY2029 FY2030 FY2031
Expenditure Type Design/Engineering
Total Project Cost
$0
$0
Construction
$264,621
187,400 77,221
$77,221
Land Acquisition
$0 $0
$0 $0
Vehicles/Equipment
Total Uses
$264,621
$187,400 $77,221
$0
$0
$0
$0 $77,221
Operating Impact
Town of Blacksburg
32
FY 2027-2031 Adopted