Town of Blacksburg
PROJECT DETAILS/COST ESTIMATES
Transit
Department
Project Title
Electric Bus Charging Infrastructure Program
Status
Existing
Project Description
With the ongoing transition to an electric bus fleet, Blacksburg Transit has developed an electric bus charging infrastructure program to build and maintain the charging equipment required to support battery electric buses. The program utilizes two types of chargers, depot chargers and on-route chargers. Depot chargers are located at the Transit maintenance facility and are used to charge buses that are not in operation. Depot chargers can charge multiple buses at once. On-route chargers are currently planned for two locations on the VT campus and will be used to charge buses currently in operation. The proposed schedule for installing and maintaining the infrastructure equipment is as follows:
Year
Description
Number
Type
FY2027
Depot Chargers Depot Chargers On-Route Charger None Scheduled None Scheduled Depot Chargers Depot Chargers On-Route Charger
2 1 1
Replacement
Expansion Expansion
FY2028 FY2029 FY2030 FY2031
2 2 1
Replacement Replacement Replacement
As with all Transit projects, if grants are unavailable, the project may be deferred.
Goal Addressed
Transportation
Estimated Start Date Estimated End Date Continuing Continuing
Funded through 6/30/2026
Total Five Year CIP
Funding Sources Federal Funds
Total Project Funding
FY2027 FY2028 FY2029 FY2030 FY2031
Continuing Continuing Continuing Continuing
Continuing 748,000 Continuing 2,312,000 Continuing 340,000 Continuing $3,400,000
88,000 335,500 $1,171,500 272,000 1,037,000 $3,621,000 40,000 152,500 $532,500 $0 $400,000 $1,525,000 $5,325,000
State Funds Local Funds Total Sources
$0
Appropriated through 6/30/2026 FY2027 FY2028 FY2029 FY2030 FY2031
Total Five Year CIP
Expenditure Type Design/Engineering Land Acquisition Vehicles/Equipment Construction
Total Project Cost
$0
Continuing 1,650,000
$1,650,000
Continuing
$0
Continuing Continuing
Continuing 1,750,000 Continuing $3,400,000
400,000 1,525,000 $3,675,000 $0 $400,000 $1,525,000 $5,325,000
Total Uses
$0
Operating Impact
No additional operating costs are anticipated.
Town of Blacksburg
135
FY 2027-2031 Adopted
Made with FlippingBook Digital Proposal Maker