Town of Blacksburg
PROJECT DETAILS/COST ESTIMATES
EGIS
Department
Project Title
Draper Rd and Miller St Box Culvert Repair
Status
Existing
Project Description
The existing box culvert running along Miller Street and Draper Road , which outlets behind the former Police Station, is aging and in poor condition. A significant portion of the stream downstream from the culvert is no longer properly contained within the designated stormwater system. Replacement of this deteriorating infrastructure is necessary to prevent potential failure. Recent findings from the Library Stormwater Investigation have identified specific areas in need of repair. This project aims to replace the existing box culvert beneath both Miller Street and Clay Street. Additionally, the 48-inch stormwater pipe system beneath the Montgomery-Floyd Regional Library will be assessed to ensure it has adequate capacity. Although its structural condition currently appears to be serviceable, further evaluation will confirm its long-term viability.
Goal Addressed
Community Wellbeing
Estimated Start Date
Estimated End Date
6/30/2028
7/1/2026
Funded through 6/30/2026
Total Five Year CIP
Funding Sources
Total Project Funding
FY2027 FY2028 FY2029 FY2030 FY2031
General Fund
$0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0
General Obligation Bonds Water & Sewer Fund
Stormwater Fund Solid Waste Fund
$380,000
50,000 330,000
$380,000
VDOT Revenue Sharing
VDOT Smart Scale
Other/Grants Total Sources
$380,000
$0
$0
$0 $50,000 $330,000
$0
$380,000
Appropriated through 6/30/2026 FY2027 FY2028 FY2029 FY2030 FY2031
Total Five Year CIP
Expenditure Type Design/Engineering
Total Project Cost
$50,000 $330,000
50,000
$50,000 $330,000
Construction
330,000
Land Acquisition
$0 $0
$0 $0
Vehicles/Equipment
Total Uses
$380,000
$0
$0
$0 $50,000 $330,000
$0
$380,000
Operating Impact
No operational impact is anticipated.
Town of Blacksburg
113
FY 2027-2031 Adopted
Made with FlippingBook Digital Proposal Maker