Town of Blacksburg
PROJECT DETAILS/COST ESTIMATES
EGIS
Department
Project Title
Ardmore St Stormwater Improvement
Status
Existing
Project Description
The stormwater pipe system running along Ardmore Drive requires a capacity upgrade. During a significant runoff event in the fall of 2023, stormwater volumes exceeded the system’s capacity, resulting in basement flooding and substantial damage to a nearby residential property. Upgrading this system will mitigate future flood risk to the affected structure. Due to spatial constraints and conflicts with existing utilities in this established neighborhood, the new stormwater infrastructure will require a non standard pipe size. This adds both complexity and cost to the project. A formal design is currently in progress; this funding request is specifically for the construction phase of the stormwater improvements.
Goal Addressed
Community Wellbeing
Estimated Start Date
Estimated End Date
1/2/2026
9/30/2026
Funded through 6/30/2026
Total Five Year CIP
Funding Sources
Total Project Funding
FY2027 FY2028 FY2029 FY2030 FY2031
General Fund
$0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0
General Obligation Bonds Water & Sewer Fund
Stormwater Fund Solid Waste Fund
$855,000
230,000 625,000
$625,000
VDOT Revenue Sharing
VDOT Smart Scale
Other/Grants Total Sources
$855,000
$230,000 $625,000
$0
$0
$0
$0
$625,000
Appropriated through 6/30/2026 FY2027 FY2028 FY2029 FY2030 FY2031
Total Five Year CIP
Expenditure Type Design/Engineering
Total Project Cost
$0
$0
$855,000
230,000 625,000
$625,000
Construction
Land Acquisition
$0 $0
$0 $0
Vehicles/Equipment
Total Uses
$855,000
$230,000 $625,000
$0
$0
$0
$0
$625,000
Operating Impact
No operational impact is anticipated.