Operating Budget 2025-2026
DESCRIPTION OF GENERAL FUND REVENUES ( continued)
ZONING AND SUBDIVISION FEES Zoning Permit Fee:
A flat $30.00 fee for review of Zoning Ordinance Regulations. A flat fee of $150.00 for a Zoning Confirmation Review. Conditional Use Permit Fee: A $500.00 application fee designed to cover advertisement and
administration of the permit. The cost of first class postage is also added to cover the cost of notifying each adjacent property owner. A $250.00 application fee for Variance Appeal and a $500.00 application fee for Right of Way Vacation designed to cover advertisement and administration of the appeal. The cost of first class postage is also added to cover the cost of notifying each adjacent property owner. Subdivision variance or appeal fees are $250.00 for major subdivisions and $100.00 for minor subdivisions.
Variance or Appeal Right of Way Fee:
Erosion Review and Sediment Control Fee:
A fee of $600.00 for erosion and sediment control plans.
Rezoning Application and Postage Fee:
A $1,500.00 application fee designed to cover advertisement and administration of the permit. Additional charge to cover postage for notification to adjoining property owners. The application fee for planned districts is $2,000.00. The application fee for minor amendments to planned districts is $1,000.00.
Comprehensive Amendment Application Fee:
A $500.00 fee for comprehensive plan amendment application.
Site Plan Fee:
A flat fee of $500.00 to cover the cost of reviewing site plans. A flat fee of $150.00 for more than two subsequent reviews.
Sign Permit Fee:
A $100.00 fee for attached signs and free standing signs.
Subdivision Fee:
A flat fee of $1,000.00 to cover review cost, or reviewing a major subdivision. A flat fee of $500.00 to cover review of final plats and minor subdivisions and the fee for subsequent reviews of the final plat is $150.00. A flat fee of $300.00 to review a lot line adjustment. An inspection fee is pass through to the developer for final engineer inspection of developments at $205.00 per week of construction for a distributed area less than two acres. The fee increases as the amount of distributed area increases. In addition, a utility oversight fee of $42.00 per hour is passed through to the developer.
Engineer Inspection Fee:
173
Made with FlippingBook Digital Publishing Software