Operating Budget 2025-2026
EQUIPMENT OPERATIONS FUND
NARRATIVE
Equipment Operations Fund (Public Works Department) maintains the Town fleet of vehicles and equipment in a safe and reliable condition and in a cost-effective manner. It assists in the determination of an appropriate replacement schedule and selection of new and replacement vehicles appropriate for the use intended.
FY 2024-2025 ACCOMPLISHMENTS
• Performed a building condition assessment for the Fleet Maintenance building (Town Garage) to include structural, electrical, mechanical, and plumbing infrastructure. • Developed detailed cost estimate for the future renovation of the Fleet Maintenance Building. • Performed condition assessment on the Public Works fueling station above ground tanks. • Maintained the billable hours for mechanics, i.e., service time billed directly to vehicles and equipment being serviced. • Analyzed the Town fleet to defer replacement and prolonged the useful life of each vehicle if it was still serviceable . • Updated fleet replacement cost and depreciation for FY26 equipment replacements. Complete the design and construction drawings for the Fleet Maintenance Building renovation. • Initiate reconditioning of Public Works fuel island. • Continue to monitor the billable hours for mechanics, i.e., service time billed directly to vehicles and equipment being serviced. • Continue to monitor garage parts inventory, delete obsolete parts, and maintain stock of parts and equipment required for preventative maintenance. • Provide technical assistance to the Sustainability Office for the installation of Electric Vehicle (EV) charging stations. FY 2025-2026 OBJECTIVES •
2022/2023 Actual
2023/2024 Actual
2024/2025 Adopted
2024/2025 Projected
2025/2026 Proposed
PUBLIC WORKS
Fleet Operations Division: Mechanic Billable Hours
80%
87%
80%
85%
85%
131
Made with FlippingBook Digital Publishing Software