Model-Based Systems Engineering with GENESYS

Risk

• Defined as the uncertainly of attaining or achieving a product or program milestone • May exist for several reasons • Budget or schedule constraints • High or leading edge technology • New designs or design concepts • Criticality to the user/customer • We capture this information by using the Risk entity

153

Look at Requirement R.2.4

The maximum staff requirement may cause an operational risk because of the many different types of tasks that may be required concurrently by the system.