MBSE with Genesys 093022

Behavioral Architecture (glass box perspective)

Operational Architecture

Physical Architecture

System Definition (black box perspective)

Enterprise Perspective

BASIS OF

ALLOCATED TO

REQ

ARCH

BEH

C ON

R ISK

UC

UC

P ROBLEM S PACE

S OLUTION S PACE

101

SE Activities Timeline for Top-Down Design

0. Define Need & System Concept

Activity bars represent movement of “center of gravity” of systems engineering team (concurrent engineering is assumed)

1. Capture & Analyze Orig. Requirements 2. Define System Boundary 4. Derive System Threads 3. Capture Originating Architecture Constraints

5. Derive Integrated System Behavior 6. Derive Component Hierarchy

7. Allocate Behavior to Components

SCHEDULE

8. Define Internal Interfaces

9. Select Design

10. Perform Effectiveness & Feasibility Analyses

11. Define Resources, Error Detection, & Recovery Behavior

12. Develop Verification & Validation Requirements/Plans

13. Generate Documentation and Specifications

102

MBSE with GENESYS

Made with FlippingBook Learn more on our blog