MBSE with Genesys 120222
Essential Tasks Before You Start
Plan the activity • Prepare a Systems Engineering Plan (e.g., SEP) • Capture process, method, and tool guidance, including conventions • Tailor the plan to your project Make sure you assign responsibility • Define the people who retain authority over the system requirements, behavioral architecture, physical architecture, interfaces, and test and integration plan
105
Step 0: Defining Need and System Context Outside our scope, inside our responsibility
106
MBSE with GENESYS
Made with FlippingBook - Online magazine maker