MBSE with GENESYS Oct 2023

Completing the Exchanges 1. Create new Items (by double ‐ clicking Item or right ‐ clicking and using New

Entity command in the entities list) 2. Drag ‐ drop Items to the correct Link a) status (Customer Connection) b) products (Customer Connection) c) collector tasking (Collector Connection) d) collector data (Collector Connection) e) certification requests (Certification Connection) f) certification responses (Certification Connection) Defining unidirectional links to specify Item flow would be premature. At this time, the exchange direction could be determined from the behavioral context.

263

Seeing the Physical System Context Diagrams

Internal Block Diagram

Physical Block Diagram

264

MBSE with GENESYS

Made with FlippingBook flipbook maker