MBSE with GENESYS 2024

Separating the Workstation Process The two remaining constructs (“Accept Request” plus “Check Certification Response” and the Functions included on its exit branches) will be performed by the Command Center 1. Select “Accept Request” 2. Shift ‐ click “Check Certification Response”

3. Cut (Ctrl+X) the two constructs 4. Select the Workstation branch 5. Paste (Ctrl+V) the constructs on the branch

513

Allocating the Functions The processes must now be allocated to the corresponding Functions 1. Click the “Insert” tab in the toolbox 2. Select the Key Entities folder (the first folder icon) 3. Select Component from the classes list 4. Select “Workstation” from the entities list 5. Drag ‐ drop “Workstation” on the functions on the upper branch and select performs 6. Select “Command Center” from the entities list 7. Drag ‐ drop “Command Center” on the functions on the lower branch and select performs

514