MBSE with GENESYS 2024
Capturing Design and Journey (the Risk Variant)
Document
Requirement & others (with possible problem)
causes (caused by)
documented by (documents)
mitigated by (mitigates)
Risk
Mitigation Activity
generates (generated by)
impacts (impacted by)
Change Request Package
generates (generated by)
Color Code
Requirement Entity Functional Entity Physical Entity Verification Entity Program Entity
Requirement Entity
Functional Entity
Physical Entity
Interface Entity
Verification Entity
Other Entity
199
Analyzing Requirement R.2.4 1. Select the Requirement class from the project explorer panel 2. Select “Maximum Staff” and review the Description
We are uncertain that we can satisfy this Requirement because of the many different types of tasks that may be required concurrently by the system. Therefore, we have an operational Risk . 3. Double ‐ click the causes relationship 4. Use New to create a new Risk “Staffing per Shift” 5. Click OK and Close 6. Double ‐ click “Staffing per Shift” to open its property sheet
200