MBSE with GENESYS 073122

Simulating the Parallel Construct

1. In the simulator, click Reset 2. Click Run The first function on each branch was enabled simultaneously All parallel branches must complete execution before rejoining and enabling the next function after the concurrency Scheduling (execution) decision for the parallel functions is deferred (“Don’t Care” sequence)

347

Incorporating an Input

1. Select “Function_004” 2. Shift- click to select “Function_005” 3. Click Connect via Input in the Diagram ribbon 4. Click “New” to create a new Item and accept “Item_001” as the name 5. Click OK How will this affect the order of execution?

348

MBSE with GENESYS

Made with FlippingBook Ebook Creator