MBSE with GENESYS 073122
Why Do Systems Engineering: The Financial Case
• Cope with complexity • Avoid omissions • Avoid invalid assumptions • Make informed, defensible decisions • Manage change • Design most efficient, economic, and robust solution • Achieve greater design control
Method 1 —
Method 2 —
Method 3 —
Hypothetical Project
Total Costs
Top-Down
Breakdown
Project Phase
Bottom-Up Cost
Requirements
1 x
1 x
1 x
Design
8 x
3 - 4 x
4 x
Build
16 x
13 - 16 x
7 x
Test
21 x
61 - 78 x
28 x
Operations 29 x 157 - 186 x 1615 x Source: Error cost escalation through the project life cycle - NASA Johnson Space Center
It is not hard to know when system engineering fails, because when something important goes wrong it usually makes the news fast. INCOSE
23
Enabling Project Success: The Motivation for SE
✓ Understanding the problem
✓ Integrating the team
✓ Defining the seams
✓ Addressing the gaps
✓ Guarding the why
Image Credit: Defense Acquisition University