MBSE with CORE 100821
Reviewing the Remaining Debris
1. In the project panel, select the Requirement class 2. Delete “Debris 0003” and “Debris 0006” (we accounted for these in the Description and Mission of our system) We can review the remaining elements that the parser identified as debris. Clicking through each element, we see decomposition of “Debris 0003” (which we have handled) as well as content that we do not need. 3. Delete the remaining debris elements
139
Renumbering Requirements Numbering requirements (and other elements) makes it easier to see the structure
1. Select Requirement “OPERATIONS” 2. Select Renumber from the toolbar (or right-click and select Renumber from the context menu) 3. Enter new number “R.1” 4. Click OK Renumbering assigns hierarchical numbers down the entire descendant tree of the selected element The Requirement class uses refined by as the parent-child relation. The parent-child relation is uniquely defined for each class.
140
MBSE with CORE