MBSE with CORE 100821

Defining the Next-Level Physical Decomposition A good decomposition and allocation is influenced by multiple considerations. For simplicity in this example, we will choose congruence between the physical and behavioral architectures. 1. Close all open windows other than the project explorer

2. Select Component in the project panel 3. Select “System Context” in the elements panel 4. Select the Structure BDD tab

487

Creating Two Subsystems

Our “front of house” customer -facing capabilities will be addressed by a workstation and our “back office” capabilities by a command center 1. Drag- drop “New Node” on “Geospatial Library” to create “Workstation” 2. Drag- drop “New Node” on “Geospatial Library” to create “Command Center” 3. Select “Geospatial Library” 4. Right-click, select Renumber from the context menu, and renumber “Geospatial Library” to “SYS” 5. Select “Workstation” then shift -click “Command Center” 6. Right-click, and use the Set Attribute command to set the Type to “Subsystem”

488

MBSE with CORE

Made with FlippingBook Digital Publishing Software