Beginners Guide to Model-Based Systems Engineering
12/18/2018
Key Semantics of Activity Diagrams, cont.
• Items
• Typically name only • Drawn as rectangle
• Shows only local relationships • Input relationship represented as single arrowhead with <
Additional information available in Chapter 9 of A Practical Guide to SysML
113
Mapping Activity Diagrams
elicits
Requirement
Use Case
elaboratedby
refinedby
basedon / specifiedby
verifiedby
specifiedby
includes/ extends/ kindof
Verification Requirement
verifiedby
fulfilledby
involves/ describes
executedby
Verification Event
Resource
employs
includes
Test Configuration
Test Activity
captures/ consumes/ produces
formedby
Test Procedure
decomposedby
Level of Detail: Highest Audience: System and software engineers Content: Composition, triggering, and allocation Use: Full specification of system behavior; best at lower levels of decomposition (design view)
Component
Function
performs
incorporates
exhibits
exitsby
built from / kindof
exposes
decomposedby
joined to
State
enters
exitedby
inputs/ outputs/ triggeredby
Exit
Interface
Port
decomposedby
includes
comprisedof
Event
Transition
responsible for
connectsto
triggeredby
Link
Item
transfers
includes
decomposedby
constrains/ usesparameter from
generates
results in
causes
assignedto
Organization
Constraint Definition
Concern
Risk
114
57
Made with FlippingBook - professional solution for displaying marketing and sales documents online