Beginners Guide to Model-Based Systems Engineering
12/18/2018
The Thinking Dimension to Requirements Capture, Part II: Risks
• Problem which requires a mitigation plan • Uncertainly of achieving a product or program milestone • Reasons • Budget or schedule • Complex technology • New designs or concepts • Criticality • Resolution captured by mitigation plan • Tracked until reduced or resolved
61
Visualizing Requirements Traditional and SysML representations
62
31
Made with FlippingBook - professional solution for displaying marketing and sales documents online