The Arrow Fall 2020
WEIGHT ROOM REMODEL
With students necessarily off campus for an extended period due to COVID-19 concerns, it seemed an ideal time to renovate the weight room in Turner Building. The weight room is in almost constant use by our students and had not been upgraded in some time. The windows were original to the building and the indoor facility was in need of a facelift. After a successful fundraising campaign, the windows and flooring were replaced and new weight lifting equipment purchased. Many thanks to the donors that helped make these much needed improvements possible.
Made with FlippingBook - Share PDF online