4-day-mbse-with-core9_2018-reva
Edit GENERAL REQUIREMENTS 1
PRINCIPLE: Because we removed the element “3.0 Specific Requirements”, we need to re‐establish traceability to the source document with the remaining root Requirements.
Double‐click on documented by
Select Geospatial Library Source Document
105
Renumber GENERAL REQUIREMENT 1 PRINCIPLE: Assign Number and Name to REQUIREMENTS to provide some structure for users looking at Requirements in the project. We will start by re‐number GENERAL REQUIREMENT 1 and 3.1 Specific Requirements. Then we will give all Requirement Elements Unique Names
Select “GENERAL REQUIREMENTS 1” ; Then Right click and select Renumber Element
In the Dialog Box: Type “R.1” and Click on “OK”
106