4-day-mbse-with-core9_2018-reva
Requirements Activities • Capture top-level or parent source requirements • Provide traceability from the source document to the parent originating requirements • Capture various source requirement attributes: • Source document paragraph title, paragraph number, and origin • Capture requirement type such as composite, constraint, functional, test, or verification • Decompose composite source requirements, be careful not to change the requirements’ meaning • Provide traceability from each parent requirement to its children • Prefer hierarchy organization but flat file organization of requirements is acceptable
87
Multiple Ways to Capture Requirements
• Copy & Paste/Paste Unformatted commands • Document Parser • Element Extractor • Import of requirements in comma-separated value (CSV) format
88
Made with FlippingBook Learn more on our blog