4-day-mbse-with-core9_2018-reva

Step 2: Link Template Elements to Engineering Data

Establish the following relationships: • Document Element: GL‐SYS System/Segment Specification: • “reports on” Component “Geospatial Library”  (identifies the  component being specified) • “references” Document “GL Source Document”  (identifies an  applicable document) • “traced from” Document “GL Source Document”  (controls the  Requirement Traceability Matrix) • Category “ Availability ” categorizes Requirement “Availability”. • Category “ Personnel ” categorizes Requirements “Maximum Staff”

Groups constraint requirements by document outline

451

Step 3: Run Assign Documentation PUID Script

Click Run Script icon,  Select Utility Folder,  Select Assign Documentation  PUID Script.  Click OK

Set Project Identifier, Click Add All, then OK

The resulting Doc. PUID additions are now locked.  They cannot be unlocked except by an Administrator

452

Made with FlippingBook Learn more on our blog