4-day-mbse-with-core9_2018-reva

Control Construct: Concurrency (Parallel Branches)

Rejoin  (synchronization)  Node

Enablement  Node

• Parallel construct

• First function on each branch enabled simultaneously • All parallel branches must complete execution before rejoining and enabling the next function after the concurrency • Scheduling (execution) decision for the parallel functions is deferred (“Don’t Care” sequence)

241

Incorporating Data

Highlight Function_004 then Function_005 and select the Data Store icon and add an Item ( Connect via does this affect the order of execution?) Align icon

242

Made with FlippingBook Learn more on our blog